Long Draw Solar is a 225 MW photovoltaic facility in Borden County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 62845, with service beginning in December 2020 and ENGIE North America as the registered operator. ENGIE describes itself as the long-term owner and operator. ENGIE reports a 15-year power-purchase arrangement serving four Texas municipal utilities.
Mapped infrastructure geometry associated with this asset.
EIA and ENGIE
PUCT filing
ENGIE
EIA
EIA plant 62845 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| SP1 | Solar Photovoltaic | Operating | 225 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| SP1 | 225 MW 225 MW summer | Solar Photovoltaic PV | Dec 2020 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
ENGIE and WETT executed the project interconnection agreement for the Long Draw 138 kV switching station.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at LGDRAW_S_ALL over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports December 2020.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
ENGIE Long Draw Solar reports 225 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
ENGIE Long Draw Solar is a Solar Photovoltaic facility in Borden County, TX, participating in the ERCOT market.
ENGIE Long Draw Solar is in Borden County, TX, inside the ERCOT balancing area.
ENGIE Long Draw Solar is operated by Engie North America according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
ENGIE Long Draw Solar reported 484.2 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, ENGIE Long Draw Solar ranks #135 of 7,597 operating plants of the same technology nationally. It ranks #59 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.