Large load · 2066 CABOT ROAD, Ville Platte, LA
Cabot's Ville Platte plant in Evangeline Parish, Louisiana, was built in 1943 and has four manufacturing units that produce more than 10 carbon black grades. Cabot announced a $90 million capital investment in 2020 that includes a system to generate electricity to power site operations. Cabot reported successful production capability for circular reinforcing carbons at the facility in October 2025.
The plant was built in 1943 and its four manufacturing units produce more than 10 different carbon black grades sold throughout North America. Cabot reported successful production capability for circular reinforcing carbons at its Ville Platte facility.
Gov. Edwards Announces $90 Million Investment By Cabot In Ville Platte - LED | Louisiana Economic Development
www.deq.louisiana.gov