Centinela Solar Energy is a photovoltaic power plant near Calexico in Imperial County, California, with 174.8 MW of EIA nameplate capacity. SDG&E is a power purchaser: the CPUC approved two 20-year power purchase agreements for the original project and its expansion in January 2011. Fluor completed the two-phase construction scope in August 2014. Project sources describe about 170 MWac and 252 MWdc, which use different rating bases from EIA nameplate.
Mapped infrastructure geometry associated with this asset.
Solar Photovoltaic
Operating generators; the 2023 disclosure concerns retired renewable-energy credits.
230 kV
EIA plant 58430 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| CSE1 | Solar Photovoltaic | Operating | 34.2 | Unknown |
| CSE2 | Solar Photovoltaic | Operating | 26.6 | Unknown |
| CSE3 | Solar Photovoltaic | Operating | 34.2 | Unknown |
| CSE4 | Solar Photovoltaic | Operating | 34.2 | Unknown |
| CSE5 | Solar Photovoltaic | Operating |
SDG&E is the buyer under two 20-year solar power purchase agreements approved by the CPUC in January 2011. The resolution lists separate minimum contractual capacities of 110 MW and 30 MW; those minimums are distinct from the plant’s 174.8 MW EIA nameplate rating.
The cited 2023 power-source disclosure concerns retired unbundled renewable-energy credits, rather than retirement of the generating equipment. EIA’s inventory continues to list operating generators for plant 58430.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CSE1 | 34.2 MW 33.4 MW summer | Solar Photovoltaic PV | Jul 2013 | Operating |
| CSE2 | 26.6 MW 25.6 MW summer | Solar Photovoltaic PV | Aug 2013 | Operating |
| CSE3 | 34.2 MW 33.4 MW summer | Solar Photovoltaic PV | Oct 2013 | Operating |
| CSE4 | 34.2 MW 33.4 MW summer | Solar Photovoltaic PV | Dec 2013 | Operating |
| CSE5 | 19 MW 18.6 MW summer | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
California Public Utilities Commission approval of SDG&E's PPA with Centinela Solar Energy, LLC. The underlying agreement resulted from SDG&E's 2009 RPS solicitation; its execution date was not disclosed in the cited public record. The PPA covered 110 MW and 235.1 GWh/year.
CAISO
CAISO · Imperial County
| 19 |
| Unknown |
| CSE6 | Solar Photovoltaic | Operating | 26.6 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Centinela Solar Energy, LLC, an LS Power member, awarded Fluor a lump-sum EPC contract and a separate O&M contract in September 2012. Fluor received full notice to proceed for Phase 1 in the third quarter of 2012; contemporary project reporting places groundbreaking in December 2012.
EIA-860 lists generator CSE1 with this operating date.
EIA-860 lists generator CSE2 with this operating date.
EIA-860 lists generator CSE3 with this operating date.
EIA-860 lists generator CSE4 with this operating date.
EIA-860 lists generator CSE5 with this operating date.
EIA-860 lists generator CSE6 with this operating date.
Fluor states that EPC and commissioning for both phases were completed in August 2014 and that the facility achieved full commercial operation in summer 2014.
LS Power announced an agreement to sell its interests in Centinela Solar Energy and two other solar projects to Capital Dynamics, subject to customary approvals and expected to close in the fourth quarter of 2020.
Capital Dynamics completed its acquisition from LS Power of a 100% interest in Centinela Solar Energy. LS Power separately described the asset as 252 MWdc / 170 MWac. The separately announced portfolio financing of over USD 400 million was not allocated to this exact asset and is excluded.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
SDG&E is the buyer under two 20-year solar power purchase agreements approved by the CPUC in January 2011. The resolution lists separate minimum contractual capacities of 110 MW and 30 MW; those minimums are distinct from the plant’s 174.8 MW EIA nameplate rating.
The cited 2023 power-source disclosure concerns retired unbundled renewable-energy credits, rather than retirement of the generating equipment. EIA’s inventory continues to list operating generators for plant 58430.
Centinela Solar Energy reports 174.8 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Centinela Solar Energy is a Solar Photovoltaic facility in Imperial County, CA, participating in the CAISO market.
Centinela Solar Energy is in Imperial County, CA, inside the CAISO balancing area.
Centinela Solar Energy is operated by Centinela Solar Energy LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Centinela Solar Energy reported 352.7 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
Centinela Solar Energy interconnects at Imperial Valley Substation.
By capacity, Centinela Solar Energy ranks #247 of 7,597 operating plants of the same technology nationally. It ranks #40 of 972 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.