Citadel Battery Storage Plant is a battery energy storage facility in Crosby, Harris County, Texas. EIA's May 2026 inventory reports a current operating rating of 204 MW / 298 MWh and a December 2024 service month. Citadel BESS LLC's April 2024 PUCT filing described the then-development-stage project as approximately 206 MW / 299 MWh, interconnected with CenterPoint Energy Houston Electric. Those current EIA and pre-operation filing scopes are presented separately. Reviewed primary sources do not identify an installed battery manufacturer, so no manufacturer is assigned.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA May 2026
PUCT filing
PUCT filing
EIA plant 67738 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| CITDL | Batteries | Operating | 204 | 298 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CITDL | 204 MW 204 MW summer | Batteries BA | Dec 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Citadel described the proposed facility as approximately 206 MW / 299 MWh and not yet commercially operational.
EIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
2 ERCOT market resources · Battery / storage
Cycles/day is discharged energy vs. usable capacity (~341 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at HLY_RN over 365 days (2025-10-27 to 2026-10-26).
The TB1 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the cheapest and dearest hour of each day, gross of round-trip losses, and excludes ancillary services. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports December 2024 for the current 204 MW / 298 MWh operating record.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Citadel Battery Storage Plant reports 204 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Citadel Battery Storage Plant is a batteries facility in Harris County, TX, participating in the ERCOT market.
Citadel Battery Storage Plant is in Harris County, TX, inside the ERCOT balancing area.
Citadel Battery Storage Plant is operated by Citadel BESS LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Citadel Battery Storage Plant reports a commercial operation date of 2024. Current status: operating. Source: EIA Sep 2026.
Citadel Battery Storage Plant reported 94.5 GWh over the twelve months to 2026-07. For a storage plant this is reported gross generation — a discharge proxy, not a cycle count or a conventional capacity factor.
By capacity, Citadel Battery Storage Plant ranks #56 of 1,061 operating plants of the same technology nationally. It ranks #18 of 254 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.