Remy Jade Power Station is an eight-unit natural-gas fast-start generating station in Harris County, Texas. EIA's May 2026 inventory reports 484 MW nameplate, 356 MW net summer, and 398.4 MW net winter capability across eight 60.5 MW combustion-turbine records. PROENERGY's project record uses a 384 MW gross project rating and identifies eight LM6000-family packages; those company and EIA capacity scopes are kept separate.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA inventory for Sep 2026
PROENERGY
EIA plant 66604 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| CTG-1 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
| CTG-2 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
| CTG-3 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
| CTG-4 | Natural Gas Fired Combustion Turbine | Operating | 60.5 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CTG-1 | 60.5 MW 44.5 MW summer | Natural Gas Fired Combustion Turbine GT | Jun 2024 | Operating |
| CTG-2 | 60.5 MW 44.5 MW summer | Natural Gas Fired Combustion Turbine GT | Jun 2024 | Operating |
| CTG-3 | 60.5 MW 44.5 MW summer | Natural Gas Fired Combustion Turbine GT | Jun 2024 | Operating |
| CTG-4 | 60.5 MW 44.5 MW summer | Natural Gas Fired Combustion Turbine GT | Jun 2024 | Operating |
| CTG-5 | 60.5 MW | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports June 2024 for CTG1 through CTG6 and October 2024 for CTG7 and CTG8.
| Unknown |
| CTG-5 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
|---|
| CTG-6 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
|---|
| CTG-7 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
|---|
| CTG-8 | Natural Gas Fired Combustion Turbine | Operating | 60.5 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
8 ERCOT market resources · Gas turbine
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at JAD_RN over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| J K Spruce | 1,488.5 MW | TX | |
| Rio Nogales Power Project | 1,108 MW | TX | |
| Barney M Davis | 1,082.2 MW | TX | |
| O W Sommers | 892 MW | TX | |
| Nueces Bay | 730.2 MW | TX | |
| Topaz Generating | 605 MW | TX | |
| Arthur Von Rosenberg | 575 MW | TX | |
| Mark One Power Station | 484 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioPROENERGY announced delivery of the complete eight-package, 384 MW project on September 17, 2024.
EIA reports October 2024 for CTG7 and CTG8.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Remy Jade Power Station reports 484 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Remy Jade Power Station is a Natural Gas Fired Combustion Turbine facility in Harris County, TX, participating in the ERCOT market.
Remy Jade Power Station is in Harris County, TX, inside the ERCOT balancing area.
Remy Jade Power Station is operated by City of San Antonio - (TX) according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Remy Jade Power Station reported 388.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Remy Jade Power Station ranks #93 of 829 operating plants of the same technology nationally. It ranks #7 of 78 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.