CyrusOne Durham DUR1 (NC-1)
Operating
CyrusOne's DUR1 data center is at 2223 NE Creek Parkway in Durham, North Carolina, in Research Triangle Park. The operator says it spans more than 420,000 sq ft with 92,320 sq ft of raised floor across eleven data halls. The DUR1-DUR2 campus, which includes the DUR2 shell delivered in 2025, has 40 MW of total IT capacity.
Loading map…
Overview
- Status
- Operating
- Operating facility
- IT floor area
- 92,320 sq ft
- Facility
- Campus power
- 40 MW
- Whole campus · Capacity basis unspecified
- Project scope
- Facility at 2223 NE Creek Parkway, Durham, NC.
Power and grid
- Utility
- Duke Energy Carolinas, LLC
The site also falls inside the Duke Energy Progress service territory.
- Nearest substations
- Unnamed tap100 kV
- Unnamed substation100 kV
- Point of interconnection
Facility and development
- IT floor area (sq ft)
- 92,320