DC BLOX Myrtle Beach Cable Landing Station (MYR1)
Operating
The DC BLOX Myrtle Beach Cable Landing Station, MYR1, is an operating subsea-cable landing and colocation facility at 1401 Howard Road in Myrtle Beach, Horry County, South Carolina. It opened in 2023. The operator lists power capacity of up to 19 MW, matching the 19 MW ultimate utility load of its on-site substation. In October 2025 DC BLOX announced a planned adjacent facility, MYR2, that would be built if demand warrants and could draw an additional 20 MW from the same substation.
Loading map…
Overview
- Campus power
- 19 MW
- Utility Service · Reported
- Status
- Operating
- Operating campus
- IT floor area
- Not disclosed
- Campus
- Compute profile
- Cable Landing Station
- Cooling design
- Reported
- Indirect adiabatic and evaporation cooling
- Project scope
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| Up to 19 MW | Capacity basis unspecified | Operating | Exact Asset | — |
| Operator-listed power capacity and full build-out design power | ||||
| 19 MW | Utility Service | Reported | Exact Asset | — |
| Ultimate utility load of the on-site substation | ||||
| 20 MW | Capacity basis unspecified | Proposed | Exact Asset | — |
| Additional power from the current on-site substation for the planned adjacent MYR2 facility, contingent on demand | ||||
- Utility
- Santee Cooper
- Substation
- On-site campus substation (19 MW ultimate utility load)
Facility and development
- Facility class
- Cable Landing Station
- Cooling systems
- Indirect adiabatic and evaporation cooling
- Grid record
- Santee Cooper · On-site campus substation (19 MW ultimate utility load)
Organizations
DC BLOXOwner · OperatorExact Asset