Denver - Centennial Data Center
Operating
Operating
Flexential’s Denver–Centennial facility operates at 12500 East Arapahoe Road, Suite C. Its published specifications include a 43,294-square-foot footprint, 1.6 MW of critical-load UPS capacity, 2N UPS redundancy and N+1 cooling. Flexential also lists access to 80 on-net carriers and a 400 Gbps backbone. Those are facility and network capabilities; the operator does not identify a named availability tier or the site’s utility substation. No site-specific ISO/RTO membership is identified; the facility is reported in the WECC grid area.
Existing facility at the specified address. The operator reports its footprint and critical power; a facility listing reports commissioned status and no leaseable power under construction or planned. Construction and commercial-operation dates are not established; available listings differ on the building year (1998 versus 1999).
The electrical point of interconnection is not disclosed for DEN05.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 1.6 MW | Critical IT Load | Operating | Exact Asset | — |
| Operator-reported critical-load UPS capacity; this is not identified as utility-service, interconnection, or gross-campus capacity. | ||||
Also reported as Flexential - Denver/Centennial (DEN05).
Denver Data Center Market — A Denver data-center market report identifies Flexential's Centennial retail data center at 12500 E. Arapahoe Road and describes it as fully leased.