Digi Power X Columbiana AI Data Center
Under Construction · 130 Industrial Parkway, Columbiana, AL
Digi Power X (formerly Digihost) is converting its former bitcoin mining site at 130 Industrial Parkway, Columbiana, Shelby County, Alabama, into a Tier III AI data center campus; mining stopped in 2025. An ARMS 200 modular unit has run there since May 15, 2026. A 10-year AI data center agreement is worth about $1.1 billion.
Loading map…
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Under Construction
- Under Construction
- IT floor area
- Not disclosed
- Campus
- Build window
- Dec 2026
- 15 MW of IT load.
- Compute profile
- AI HPC · Colocation
- Project scope
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 15 MW | Critical IT Load | Reported | Phase 1 | — |
| Phase 1 IT load expected to be delivered in December 2026. | ||||
| 25 MW | Critical IT Load | Reported | Phase 2 | — |
| Phase 2 adds 25 MW of IT load, expected March 2027, for up to 40 MW of IT load. | ||||
Facility and development
- Facility class
- AI HPC · Colocation
- Availability tier
- Tier III
- Operating context
- Digi Power X ceased bitcoin mining at the Alabama site in 2025 to convert it to AI infrastructure; an ARMS 200 modular unit has operated at Tier 3 standards there since May 15, 2026, generating AI revenue.
- Permits and dockets
- Shelby County building permit, $7,024,000, issued June 22, 2026 to Dunn Building Company LLC for Digihost Technology Inc at 130 Industrial Parkway