Galloway 1 Solar Farm is a 250 MW photovoltaic facility in Concho County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 61920, with service beginning in October 2021 and 225DD 8me LLC as the registered operator. Ardian's announcement identifies Morgan Stanley Renewables as tax-equity investor and a CIT-led bank consortium as construction lenders; it does not disclose transaction amounts.
Mapped infrastructure geometry associated with this asset.
EIA
EIA
Ardian
Ardian
EIA plant 61920 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GSM01 | Solar Photovoltaic | Operating | 250 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GSM01 | 250 MW 250 MW summer | Solar Photovoltaic PV | Oct 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
Ardian and Skyline disclosed the acquisition and construction-financing parties.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Observed ERCOT settlement prices at GALO_RN1 over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports October 2021.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Galloway 1 Solar Farm reports 250 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Galloway 1 Solar Farm is a Solar Photovoltaic facility in Concho County, TX, participating in the ERCOT market.
Galloway 1 Solar Farm is in Concho County, TX, inside the ERCOT balancing area.
Galloway 1 Solar Farm is operated by 225DD 8me LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Galloway 1 Solar Farm reports a commercial operation date of 2021. Current status: operating. Source: EIA Sep 2026.
Galloway 1 Solar Farm reported 491.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Galloway 1 Solar Farm ranks #86 of 7,597 operating plants of the same technology nationally. It ranks #37 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.