Rambler
Rambler reports 200 MW solar in ERCOT with linked market-resource generation history.
Overview
- Registry anchor
- Plant 62141
- plant-62141
Infrastructure record
- Alternate name
- Rambler Solar Project
Rambler reports 200 MW solar in ERCOT with linked market-resource generation history.
Mapped infrastructure geometry associated with this asset.
EIA plant 62141 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| RMBLR | Solar Photovoltaic | Operating | 200 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Solar · 200 MW
Nolan County
Solar · 172.8 MW
Tom Green County
Solar · 200 MW
Jones County
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| RMBLR | 200 MW 200 MW summer | Solar Photovoltaic Solar · PV | Jun 2020 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at RAMBLER_UNIT over 365 days (2025-10-10 to 2026-10-09).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Frontier Windpower II | 351.8 MW | OK | |
| Pisgah Ridge Solar, LLC | 250 MW | TX | |
| Mesquite Creek Wind | 211.2 MW | TX | |
| Ledyard Windpower, LLC | 207 MW | IA | |
| Mesteno | 201.6 MW | TX | |
| Los Vientos Wind 1B | 201.6 MW | TX | |
Project milestones and public references behind the asset profile.
From Recurrent Energy
EIA-860 lists generator RMBLR with this operating date.
200 MWac in Tom Green County
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Rambler reports 200 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Rambler is a Solar Photovoltaic facility in Tom Green County, TX, participating in the ERCOT market.
Rambler is in Tom Green County, TX, inside the ERCOT balancing area.
Rambler is operated by Deriva Energy according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Rambler reported 361.4 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Rambler ranks #152 of 7,597 operating plants of the same technology nationally. It ranks #69 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.