Ganado Solar is a co-located solar and battery facility in Jackson County, Texas. EIA's May 2026 inventory lists a 150.5 MW photovoltaic generator entering service in October 2023 and a separate 70.5 MW battery entering service in March 2024 under Plant ID 67284, both operated by Enel Green Power Ganado Solar LLC. Enel describes the broader solar project as 208 MWdc and identifies Nestlé as the sole tax-equity investor and purchaser of all renewable-electricity attributes under a 15-year agreement. The 221 MW shown here is the sum of separate solar and storage power ratings, not simultaneous net generation.
Mapped infrastructure geometry associated with this asset.
EIA
EIA
Enel
EIA
EIA plant 67284 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GBA | Batteries | Operating | 70.5 | 115 |
| GS1 | Solar Photovoltaic | Operating | 150.5 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GBA | 70.5 MW 70.5 MW summer | Batteries BA | Mar 2024 | Operating |
| GS1 | 150.5 MW 150.5 MW summer | Solar Photovoltaic PV | Oct 2023 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Enel identified Nestlé as sole tax-equity investor and renewable-attribute purchaser.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
3 ERCOT market resources · Battery / storage, Solar
Cycles/day is discharged energy vs. usable capacity (~112 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at MUSTNGCK_ALL over 365 days (2025-10-26 to 2026-10-25).
The TB1 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the cheapest and dearest hour of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Rock Creek Wind Project | 300 MW | MO | |
| 25 Mile Creek | 250 MW | OK | |
| Ganado SolarCurrent | 221 MW | TX | |
| Osage Wind, LLC | 150.4 MW | OK | |
| Drift Sand Wind Project LLC | 108 MW | OK | |
| Little Elk Wind Project LLC | 74 MW | OK | |
| Paynesville Solar | 10 MW | MN | |
| Albany Solar | 10 MW | MN |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA reports October 2023.
EIA reports March 2024.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Ganado Solar reports 70.5 MW battery storage + 150.5 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Ganado Solar is a Batteries; Solar Photovoltaic; facility in Jackson County, TX, participating in the ERCOT market.
Ganado Solar is in Jackson County, TX, inside the ERCOT balancing area.
Ganado Solar is operated by Enel Green Power NA, Inc. according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Ganado Solar reports a commercial operation date of 2023. Current status: operating. Source: EIA Sep 2026.
Ganado Solar reported 330.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Ganado Solar settles at MUSTNGCK_ALL.
By capacity, Ganado Solar ranks #283 of 7,597 operating plants of the same technology nationally. It ranks #102 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.