Aktina Solar is a 500 MWac solar facility in Wharton County, Texas. EIA's May 2026 inventory reports one 500 MW operating generator record dated December 2023. Tokyo Gas reports 631 MWdc and 500 MWac, 100% ownership through Tokyo Gas America, phased operation beginning in August 2021, and full operation from December 2023. Hecate Energy developed the project and sold it to Tokyo Gas America in 2020.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
Tokyo Gas
Tokyo Gas
Tokyo Gas
EIA plant 64927 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| AKS01 | Solar Photovoltaic | Operating | 500 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| AKS01 | 500 MW 500 MW summer | Solar Photovoltaic PV | Dec 2023 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
Tokyo Gas America acquired the project from Hecate Energy.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at PLN_ALL over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Tokyo Gas reports that phased operation began in August 2021.
Tokyo Gas reports the completed project fully operating from December 2023.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Aktina Solar reports 500 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Aktina Solar is a Solar Photovoltaic facility in Wharton County, TX, participating in the ERCOT market.
Aktina Solar is in Wharton County, TX, inside the ERCOT balancing area.
Aktina Solar is operated by Hecate Energy Ramsey, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Aktina Solar reports a commercial operation date of 2021. Current status: operating. Source: EIA Sep 2026.
Aktina Solar reported 1,060.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Aktina Solar settles at PLN_ALL.
By capacity, Aktina Solar ranks #10 of 7,597 operating plants of the same technology nationally. It ranks #4 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.