Under Construction · Google · 3500 River Road, The Dalles, OR
Google is building two data centers at 3500 River Road in the Port of The Dalles, Wasco County, Oregon, on the site of a former aluminum smelter that became a Superfund cleanup site. The property is owned by Design LLC, a Google company, and Whiting-Turner is general contractor. The first building is about 288,000 sq ft; the city approved the second, a single-story 290,000 sq ft building, in January 2024. A Strategic Investment agreement abates an estimated $147 million in property taxes over 20 years. The plants rely on surface water captured in on-site reservoirs.
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Under Construction
- Former aluminum smelter site in the Port of The Dalles; a Superfund cleanup site before Google's purchase.
- IT floor area
- Not disclosed
- 2 reported buildings · Campus
- Project cost
- $600.0M
- Estimated construction cost in the cited project filing.
- Campus buildout
- 290,000 sq ft
- Building 2 · Approved
Power and grid
Facility and development
- Buildings
- 2
- Water source
- Surface water captured in ground reservoirs at the site; Google transferred the smelter site's water rights to the City of The Dalles.
- Project cost (USD)
- 600,000,000
- Tax abatements
- Two-data-center Strategic Investment agreement with The Dalles and Wasco County abating an estimated $147 million over 20 years