Hamilton Innovation Center
Paused
Hamilton Innovation Center is a proposed data center on about 29 acres at 1380 University Boulevard in Hamilton, Butler County, Ohio. The land is owned by the city and Logistix Property Group is the developer. The developer asked the city to pause a power feasibility study in January 2026 and the project was still reported paused in June 2026. Requests and targets have ranged from more than 100 MW to up to 240 MW. The city has said delivering 45 MW would take at least 24 months.
Loading map…
Overview
- Exact-site power
- 45 MW
- Utility Service · Reported
- Status
- Paused
- Paused facility
- Site
- 29.196 acres
- Facility
- Compute profile
- Hyperscale
- Project scope
- Facility at 1380 University Boulevard, Hamilton, OH.
- Power and grid
- Preliminary utility finding: at least 24 months to deliver 45 MW
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 240 MW | Interconnection Request | Requested | Exact Asset | — |
| Feasibility-study request for power supply to the site; not an approved service amount | ||||
| Up to 240 MW | Campus Gross Power | Proposed | Exact Asset | — |
| Maximum instantaneous electricity requirement as proposed | ||||
| 200+ MW | Capacity basis unspecified | Target | Exact Asset | — |
| Developer target for facility power | ||||
| 100+ MW | Capacity basis unspecified | Proposed | Exact Asset | — |
| Architect-marketed design capacity | ||||
| 45 MW | Utility Service | Reported | Exact Asset | — |
| Preliminary utility finding: at least 24 months to deliver 45 MW | ||||
- Utility
- City of Hamilton electric system
Facility and development
- Site area (acres)
- 29.196
- Facility class
- Hyperscale
Organizations
Logistix Property GroupDeveloperExact Asset