Horse Hollow Wind Energy Center is a 735.5 MW wind complex in Taylor and Nolan counties, Texas. NextEra Energy Resources' project fact sheet reports 421 turbines across three phases: 142 GE 1.5 MW turbines in Horse Hollow I, 130 Siemens 2.3 MW turbines in Horse Hollow II, and 149 GE 1.5 MW turbines in Horse Hollow III. The first phase entered service in 2005-2006 and phases II and III in 2006; EIA groups the three phases under Plant ID 56291.
Turbine-field layout for comparing wind assets. Not a site map.
EIA May 2026
2005-2006 vintages
Official project fact sheet
Project and transmission records
EIA plant 56291 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 213 | Unknown |
| 2 | Onshore Wind Turbine | Operating | 223.5 | Unknown |
| 3 | Onshore Wind Turbine | Operating | 299 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 213 MW 213 MW summer | Onshore Wind Turbine WT | Dec 2005 | Operating |
| 2 | 223.5 MW 223.5 MW summer | Onshore Wind Turbine WT | Jun 2006 | Operating |
| 3 | 299 MW 299 MW summer | Onshore Wind Turbine WT | Jun 2006 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports December 2005 for the 213 MW first phase; NextEra describes its operating start as 2005-2006.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Observed ERCOT settlement prices at HHOLLW2_WND1 over 365 days (2025-10-26 to 2026-10-25). This plant is also crosswalked to HHOLLW3_WND1, HHOLLW4_WND1, H_HOLLO_WND1; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports June 2006 for the 299 MW and 223.5 MW phases.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Horse Hollow Wind Energy Center reports 735.5 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Horse Hollow Wind Energy Center is a Onshore Wind Turbine facility in Taylor County, TX, participating in the ERCOT market.
Horse Hollow Wind Energy Center is in Taylor County, TX, inside the ERCOT balancing area.
Horse Hollow Wind Energy Center is operated by FPL Energy Horse Hollow LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Horse Hollow Wind Energy Center reports a commercial operation date of 2005. Current status: operating. Source: EIA Sep 2026.
Horse Hollow Wind Energy Center reported 2,412.4 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Horse Hollow Wind Energy Center ranks #5 of 1,374 operating plants of the same technology nationally. It ranks #2 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.