Intel Corporation Aloha Campus
Large load · 3585 S.W. 198TH AVENUE, Aloha, OR
Intel Corporation operates the Aloha campus at 3585 SW 198th Avenue in Aloha, Washington County, Oregon, a semiconductor manufacturing facility where the focus shifted to back-end operations. Intel reports 210,084 MWh/year of energy used at the campus and 98 % renewable electricity for 2024. Oregon DEQ treats Aloha and the Ronler Acres campus as one source for air permitting.
Overview
Intel Corporation operates two semiconductor manufacturing facilities in Washington County, Oregon, the Ronler Acres campus in Hillsboro and the Aloha campus in Aloha. Most original operations at the Aloha Campus had ceased by 2003/2004 when the focus shifted to back-end operations: Die Prep, Controlled Collapse Chip Connection and Sort. The last steps in the chip manufacturing process occur at the Aloha campus.
Profile
- Electricity and grid
- Intel reports 210,084 MWh/year of energy used at Aloha and 98 % of electricity renewable. Intel does not participate in the Portland General Electric Dispatchable Standby Generation program, so non emergency operation of the diesel emergency engines is limited to training and maintenance and readiness testing. The combined Aloha and Ronler Acres source has 86 emergency generators and 4 fire pumps. Intel signed a 15-year agreement with PGE to enable the Daybreak Solar facility, a 138-megawatt solar facility in Wasco County, Oregon, and Intel will be the only purchaser of its power.
- Permits
- DEQ issued Intel's air quality permit for the Ronler Acres and Aloha sites on April 16, 2024. The Aloha campus holds Standard Air Contaminant Discharge Permit, Source Number 34-2681. The Aloha stormwater permit is NPDES Permit Number 1200-Z, File Number 41940.
Facility
- Activity
- Back-end chip operations: die prep, controlled collapse chip connection and sort
- Industry
- Manufacturing
- Site type
- Campus
- Operating status
- Operating
Reported Apr 16, 2024
- Demand flexibility
Permits and agreements
- Permit
- Standard Air Contaminant Discharge Permit, Source Number 34-2681
Related records
Timeline
- May 29, 2025
- Aloha facility called into the Cleaner Air Oregon program.
Department of Environmental Quality : Intel Corporation (Aloha Campus and Gordon Moore Park at Ronler Acres Campus) : Northwest Region Facilities : State of Oregon
- Apr 16, 2024
- DEQ issued Intel's air quality permit for the Ronler Acres and Aloha sites.
Department of Environmental Quality : Intel : Projects : State of Oregon