EIA's May 2026 inventory dates its aggregate wind-generator record to August 2015; Pattern announced full operation on September 28, 2015.
EIA inventory for Sep 2026
EIA
EIA plant 59442 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 200.1 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 200.1 MW 200.1 MW summer | Onshore Wind Turbine WT | Aug 2015 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| SunZia Wind South | |||
Project milestones and public references behind the asset profile.
Pattern acquired the project and described the 87-turbine build.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Wind
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at LGW_UNIT_ALL over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA dates the aggregate generator to August 2015.
Pattern disclosed the final build and offtake structure.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Logans Gap Wind reports 200.1 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Logans Gap Wind is a Onshore Wind Turbine facility in Comanche County, TX, participating in the ERCOT market.
Logans Gap Wind is in Comanche County, TX, inside the ERCOT balancing area.
Logans Gap Wind is operated by Pattern Operators LP according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Logans Gap Wind reported 605.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Logans Gap Wind settles at LGW_UNIT_ALL.
By capacity, Logans Gap Wind ranks #278 of 1,374 operating plants of the same technology nationally. It ranks #94 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.