Post Oak Wind
Post Oak Wind LLC is a wind power facility with 200 MW of EIA-reported operating capacity in Shackelford County, Texas, registered as EIA Plant ID 56483. Horizon Wind Energy LLC is the public owner or developer; Mesquite Wind LLC is the registered plant entity or operator. Commercial operation began in December 2007. The facility interconnects at Post Oak 2 substation (connects to ONCOR Long Creek Switching Station) at 138 kV.
Overview
- Reported capacity
- 200 MW
- EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- Technology
- Onshore Wind Turbine
- Primary generation technology.
- Registry anchor
- Plant 56483
- Mesquite Wind LLC · Shackelford County · ERCOT
- Operating status