Lumina II is a co-located solar-and-storage plant in Scurry County, Texas. EIA's May 2026 inventory reports a 326.6 MW nameplate solar generator with 320 MW seasonal capability, dated January 2024, plus a 160 MW battery generator dated October 2025. Intersect Power identifies the battery as a 320 MWh, two-hour system using 86 Tesla Megapacks. Intersect's 828 MWp / 640 MWac Lumina announcement covers the broader Lumina solar project, while the $837 million financing covers three Texas battery projects; neither portfolio figure is assigned solely to Lumina II.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA and Intersect
Intersect Power
EIA May 2026
EIA plant 65644 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| LU2BA | Batteries | Operating | 160 | 320 |
| LUMII | Solar Photovoltaic | Operating | 326.6 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| LU2BA | 160 MW 160 MW summer | Batteries BA | Oct 2025 | Operating |
| LUMII | 326.6 MW 320 MW summer | Solar Photovoltaic PV | Jan 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator LUMII with this operating date.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Lumina Solar Project | 486.6 MW | TX | |
| Lumina II Solar ProjectCurrent | 486.6 MW | TX | |
| IP Radian, LLC | 480 MW | TX | |
| Oberon Solar Project | 375 MW | CA | |
| Oberon II Solar Project | 375 MW | CA | |
| Blythe Mesa Solar II | 335.6 MW | CA |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioIntersect announced $837 million for three Texas battery projects, including Lumina II.
EIA's 160 MW Lumina II battery record carries October 2025.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Lumina II Solar Project reports 160 MW battery storage + 326.6 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Lumina II Solar Project is a Solar Photovoltaic facility in Scurry County, TX, participating in the ERCOT market.
Lumina II Solar Project is in Scurry County, TX, inside the ERCOT balancing area.
Lumina II Solar Project is operated by IPX Power USA, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Lumina II Solar Project reported 706.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Lumina II Solar Project ranks #31 of 7,597 operating plants of the same technology nationally. It ranks #18 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.