Roadrunner is a solar-and-battery hybrid in Upton County, Texas. EIA's May 2026 inventory reports two photovoltaic generators totaling 400 MW AC and 497 MW DC plus a 63.3 MW / 108.6 MWh battery; operating net summer capability is 450 MW. Enel describes the solar project as 497 MW across a 252 MW first phase and 245 MW second phase, with 1.2 million bifacial panels, and describes the storage project as 57 MW / 85.7 MWh. The EIA and Enel figures use different AC, DC, seasonal, and developer scopes and are not interchangeable.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA May 2026
Enel
Enel
EIA plant 62561 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| BA | Batteries | Operating | 63.3 | 108.6 |
| RODR1 | Solar Photovoltaic | Operating | 200 | Unknown |
| RODR2 | Solar Photovoltaic | Operating | 200 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| BA | 63.3 MW 50 MW summer | Batteries BA | Jul 2023 | Operating |
| RODR1 | 200 MW 200 MW summer | Solar Photovoltaic PV | Nov 2019 | Operating |
| RODR2 | 200 MW 200 MW summer | Solar Photovoltaic PV | Sep 2020 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator RODR1 with this operating date.
Enel
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Battery / storage
Cycles/day is discharged energy vs. usable capacity (~81 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at QUEEN_BA_RN over 365 days (2025-10-27 to 2026-10-26).
The TB1 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the cheapest and dearest hour of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator RODR2 with this operating date.
EIA reports July 2023 for battery generator BA.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Roadrunner, LLC reports 63.3 MW battery storage + 400 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Roadrunner, LLC is a Batteries; Solar Photovoltaic; facility in Upton County, TX, participating in the ERCOT market.
Roadrunner, LLC is in Upton County, TX, inside the ERCOT balancing area.
Roadrunner, LLC is operated by Roadrunner Solar, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Roadrunner, LLC reported 1,015.4 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Roadrunner, LLC ranks #21 of 7,597 operating plants of the same technology nationally. It ranks #12 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.