Materion Brush — Elmore plant
Large load · 14710 W. Portage River S. Rd., Elmore, OH
Materion Brush Inc. operates a facility at 14710 W. Portage River Road South in Elmore, Ohio, that produces beryllium alloys, aluminum beryllium materials and pure beryllium. It is part of Materion Corporation. PJM planning documents describe approximately 20 MW of load on the Brush Wellman – Genoa 69 kV line.
Overview
Materion operates a facility that produces beryllium alloys, aluminum beryllium materials and pure beryllium. The Elmore site has developed a state-of-the-art investment casting capability for aerospace, defense and precision industrial equipment customers. Materion agreed to supply beryllium fluoride for FLiBE molten salt, with shipments from its Elmore facility to begin.
Profile
- Electricity and grid
- A May 2025 PJM planning document describes the existing Brush Wellman – Genoa 69 kV Line as approximately 11.4 miles long with approximately 20 MWs of load and 2,592 customers at risk. That figure is for the line, not the plant alone.
- Permits
- Ohio EPA's September 2026 draft air Permit-to-Install P0141425 covers initial installation of decomposition furnace #4 in the Pebble Plant emission unit group. The facility's hazardous-waste EPA ID number is OHD 004 212 999, and EPA's registry associates it with NPDES permit OH0002518.
Facility
- Activity
- Beryllium alloys, aluminum beryllium materials and pure beryllium
- Industry
- Manufacturing
- Site type
- Facility
- Operating status
- Operating
Reported Feb 22, 2024
Related records
Timeline
- Sep 28, 2026
- Ohio EPA draft permit for decomposition furnace #4 in the Pebble Plant
scs-public.s3-us-gov-west-1.amazonaws.com