Menlo Digital MD-PHX1 Phoenix Data Center Campus
Under Construction
Under Construction
MD-PHX1 is a five-building data center campus at 4801-4811 East Thistle Landing Drive in Phoenix, Arizona, being built by Menlo Digital on the former Thistle Landing Office Park. Local reporting in October 2026 describes it as under construction. The developer lists a 257 MW utility feed and 180 MW of critical IT power for the full campus, with a dedicated substation being installed by Salt River Project. No tenant has been named.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 257 MW | Utility Service | Proposed | Exact Asset | — |
| Utility feed to the campus, developer-reported | ||||
| 180 MW | Critical IT Load | Proposed | Exact Asset | — |
| Critical IT power for the full five-building campus | ||||
| 257 MW | Contracted Power | Reported | Exact Asset | — |
| Labeled secured power by the developer; the utility agreement itself was not seen | ||||