Meta Eagle Mountain Data Center
Operating · Meta · 1499 North Pony Express Parkway, Eagle Mountain, UT
Meta's Eagle Mountain Data Center is at 1499 North Pony Express Parkway in Eagle Mountain, Utah, held by Meta subsidiary Stadion LLC. Ground was broken in 2018. Utah air permits describe five existing buildings, and Meta announced a further expansion in September 2026, raising its Utah investment to more than $3 billion. Rocky Mountain Power serves the site. The 2023 approval order covers 37 diesel emergency generators, most rated 3,212 kW. Meta says the new buildings will use closed-loop liquid cooling with dry cooling.
Loading map…
Overview
- Exact-site power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Operating
- Operating facility
- IT floor area
- Not disclosed
- Facility
- Compute profile
- Hyperscale
- Cooling design
- Reported
- Closed-loop liquid cooling with dry cooling for the new buildings
- Project scope
Power and grid
- Backup generation
- 37 diesel emergency generators and one fire pump engine (Utah DAQ AO DAQE-AN159410008-23)
Facility and development
- Construction
- Ground broken in 2018; five buildings existed by 2023; Meta announced a further expansion in September 2026 with new buildings using closed-loop liquid cooling.
- Facility class
- Hyperscale
- Cooling systems
- Closed-loop liquid cooling with dry cooling for the new buildings
- Air permits
- Utah DAQ Approval Order DAQE-AN159410008-23 (Stadion LLC - Eagle Mountain Data Center)