Meta Kansas City Data Center
Operating
The Meta Kansas City Data Center is an operating campus in the Golden Plains Technology Park in Kansas City, Missouri. Meta announced on August 20, 2025 that it was serving traffic, after breaking ground in 2022. Local reporting describes three data center buildings and one warehouse totaling 1.4 million square feet. Evergy is Meta's utility partner for the site, and the Zone 3 plat includes a lot for an electrical substation. No campus load in megawatts is published.
Loading map…
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Operating
- Operating campus
- IT floor area
- Not disclosed
- Campus
- Cooling design
- Reported
- Cooling technology significantly more water efficient than the industry standard
- Project scope
- Three data center buildings and one warehouse, 1.4 million square feet combined; groundbreaking in 2022
Power and grid
- ISO / RTO
- SPP
- Substation
- Golden Plains Zone 3 plat creates a lot for an electrical substation
- Backup generation
- Building exteriors are lined with diesel generators; count and ratings not published
Facility and development
- Construction
- Three data center buildings and one warehouse, 1.4 million square feet combined; groundbreaking in 2022
- Land transaction
- Velvet Tech Services, LLC acquired approximately 374.5 acres of undeveloped land in Zone 3 of the Golden Plains Technology Park
- Cooling systems
- Cooling technology significantly more water efficient than the industry standard
- Permits and dockets
- Missouri DNR air construction permit 042024-001 (de minimis), issued 04/09/2024
Organizations
Velvet Tech Services, LLCOwnerExact Asset
MetaOperatorExact Asset