Microsoft Ginger West Data Center Campus
Under Construction
Microsoft is developing the Ginger West data center campus on about 188 acres at 11100 Booneville Road in West Des Moines, Dallas County, Iowa. Development began in 2021 and construction is estimated to finish by summer 2028. MISO's new-load announcements list Project Ginger West at 207 MW of load. A Title V air permit covers the diesel engines and fuel tanks that back up the campus.
Loading map…
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Under Construction
- Under Construction
- IT floor area
- Not disclosed
- Campus
- Project scope
- Construction is estimated to be completed by summer 2028; completion does not indicate datacenter operation or availability
- Power and grid
- No exact-site power capacity has been disclosed. Reported utility context: MidAmerican Energy.
Power and grid
- Utility
- MidAmerican Energy
- ISO / RTO
- MISO
- Substation
- Electric substation planned on the Ginger West site
- Backup generation
- Air permit equipment list includes Cummins diesel engines and 126 diesel generator engine fuel tanks
Facility and development
- Construction
- Construction is estimated to be completed by summer 2028; completion does not indicate datacenter operation or availability
- Air permits
- Title V air operating permit 26-TV-003, expiration 04/09/2031
- Grid record
- MidAmerican Energy · MISO · Electric substation planned on the Ginger West site
Organizations
MicrosoftOperator · DeveloperExact Asset