North Tampa, Florida data center
Operating
Operating
Flexential’s North Tampa facility at 8350 Parkedge Drive has operated since 2015. The operator reports a 60,166-square-foot data-center footprint and 3 MW of critical-load UPS capacity, with two diverse TECO feeds. A third-party listing reports 19,236 square feet of usable white space; that is kept distinct from the operator’s total footprint. Two 2.5 MW Caterpillar generators provide backup, separate from the site’s critical IT load. Cooling is listed as N+1.
Existing North Tampa / TPA03 facility. Listed as operational in 2015; this is not a documented permit construction-completion date. The reported white-space/usable area is 19,236 sq ft.
Additional leaseable power is planned. The capacity, construction dates, completion date, and online date are not stated; no leaseable power is reported under construction.
The site also falls inside the Tampa Electric Co service territory.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 3 MW | Critical IT Load | Reported | Exact Asset | — |
| Reported 3 MW critical-load UPS capacity. | ||||
| 2.6 MW | Utility Service | Reported | Exact Asset | — |
| Reported continuous utility power from TECO. | ||||
| 2.5 MW | Backup Generation | Reported | Exact Asset | — |
| Reported rating per generator; two Caterpillar backup generators are listed. The per-unit figure is not summed. | ||||
Also reported as Tampa - North, Flexential Tampa - North (TPA03), Flexential - Tampa/North (TPA03).
The City reported that Tampa Police were seeking two suspects in a cable theft at the data center.
The newspaper reported that two people stole welding cable from Flexential Tampa-North and fled in a U-Haul truck.