North Tampa, Florida data center
Operating · Flexential · 8350 Parkedge Drive, Tampa, Florida
Flexential’s North Tampa facility at 8350 Parkedge Drive has operated since 2015. The operator reports a 60,166-square-foot data-center footprint and 3 MW of critical-load UPS capacity, with two diverse TECO feeds. A third-party listing reports 19,236 square feet of usable white space; that is kept distinct from the operator’s total footprint. Two 2.5 MW Caterpillar generators provide backup, separate from the site’s critical IT load. Cooling is listed as N+1.
Overview
- Exact-site power
- 3 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating; no leaseable power is reported under construction.
- Facility size
- 60,166 sq ft
- Facility
- Opened
- 2015
- North Tampa facility
- Compute profile
- Colocation
- High-density, compute-intensive workloads
- Cooling design
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 3 MW | Critical IT Load | Reported | Exact Asset | — |
| Reported 3 MW critical-load UPS capacity. | ||||
| 2.6 MW | Utility Service | Reported | Exact Asset | — |
| Reported continuous utility power from TECO. | ||||
| 2.5 MW | Backup Generation | Reported | Exact Asset | — |
| Reported rating per generator; two Caterpillar backup generators are listed. The per-unit figure is not summed. | ||||
- Utility
- Tampa Electric Company (TECO)
Facility and development
- IT floor area (sq ft)
- 19,236
- Gross floor area (sq ft)
- 60,166
- Site area (acres)
- 6.883
- Construction
- The North Tampa facility is listed as operational since 2015. Flexential describes it as a two-story facility with a 60,166-square-foot footprint and 3 MW of critical power. Additional leaseable power is planned, but none is reported under construction; no planned amount or timeline is stated.