NTT DATA Quincy Data Center
Operating
The NTT DATA Quincy Data Center is a purpose-built facility at 525 D St NW in Quincy, Grant County, Washington. Dell developed it and opened it in 2012, and NTT DATA kept using it after GI Partners bought the property in a 2019 sale-leaseback. At that sale the site was reported to have 14 MW of gross utility power. Grant County Public Utility District supplies electricity, and an air permit covers diesel backup generators.
Loading map…
Overview
- Campus power
- 14 MW
- Utility Service · Reported
- Status
- Operating
- Operating campus
- IT floor area
- Not disclosed
- Campus
- Project scope
- Campus at 525 D St NW, Quincy, WA.
- Power and grid
- Gross utility power reported at the January 2019 property acquisition
- Cooling and environment
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 14 MW | Utility Service | Reported | Exact Asset | — |
| Gross utility power reported at the January 2019 property acquisition | ||||
- Utility
- Grant County Public Utility District
- Substation
- Original design called for dual-feed supply from two independent substations on separate supply lines
- Backup generation
- Permit authorizes five 3.0 MWe diesel engine/generator sets, reduced from twenty-eight; per-unit rating, not a campus capacity
Facility and development
- Grid record
- Grant County Public Utility District · Original design called for dual-feed supply from two independent substations on separate supply lines
Organizations
G1 TARE QUINCY LLCOwnerExact Asset
NTT DATAOperatorExact Asset
DellDeveloperExact Asset