PCC Structurals' Large Parts Campus in Milwaukie, Oregon manufactures castings as large as 79 inches in titanium, steel and superalloy. The campus has about 664,081 square feet of manufacturing space. A 2011 PGE power failure there led to a nitrogen oxide release, and the campus has since upgraded its electrical systems and permitted a new emergency generator.
Overview
LPC specializes in air and vacuum investment cast components for aerospace, energy, and commercial applications. LPC manufactures castings as large as 79 inches in titanium, steel and superalloy, in 664,081 square feet of manufacturing space.
Profile
- Electricity and backup power
- In 2011, a PGE power failure led to the release of an orange-colored plume of nitrogen oxide, and the Large Parts Campus then upgraded its electrical systems to ensure an electrical spike would not damage control or system circuits. In September 2025 DEQ modified the campus's Air Contaminant Discharge Permit for a new emergency generator engine to supply power to the scrubber system in the event of a power outage.
- Ownership
- PCC is a wholly-owned subsidiary of Berkshire.
- Permits and enforcement
- DEQ regulates the facilities through its air quality permitting program and industrial stormwater permitting program, and is working on air quality permits for the Large Parts Campus. In October 2026 DEQ issued a pre-enforcement notice to PCC for water pollution violations at Johnson Creek in September 2026.
Facility
- Activity
- Titanium, steel and superalloy investment castings
- Industry
- Manufacturing
- Site type
- Campus
- Operating status
- Operating
Permits and agreements
- Permit
- Air Contaminant Discharge Permit
Related records
Timeline
- Mar 16, 2026
- DEQ approved the source test report for the Large Parts Campus.