The Phillips 66 Bayway Refinery at 1400 Park Avenue in Linden, Union County, New Jersey has a crude throughput of 275 MBD on about 1,235 acres. The Linden Cogeneration facility is co-located with the refinery and has long-term process steam and electricity sales contracts with industrial off-takers there.
Overview
Bayway's facilities include crude distilling, naphtha reforming, fluid catalytic cracking, solvent de-asphalting, hydrodesulfurization and alkylation units. Production is 145 MBD of gasolines and 115 MBD of distillates, with crude throughput of 275 MBD and a polypropylene plant able to produce up to 775 million pounds per year.
Profile
- Electricity and grid
- The Linden Cogen facility enjoys long-term process steam and electricity sales contracts with large investment grade industrial off-takers in the co-located Bayway refinery anchored by Phillips 66. JERA Americas describes Linden Cogen as a 972 MW natural gas-fueled thermal cogeneration plant in Linden, New Jersey. A 2000 announcement said Tosco would consume 125 MW at the end of 2001, with the balance of 45 MW added to the regional electricity grid. Linden 1-5 have a nameplate of 822.4 MW connected to the New York bulk power system, and Linden 6 has a nameplate of 212.5 MW connected to PJM.
- Ownership and recent changes
- The facility is owned by and is operated by Phillips 66 Company, according to a New Jersey DEP notice. In June 2023 Linden Cogeneration completed commissioning of its hydrogen blending initiative, and in October 2026 EGCO signed an agreement to acquire an additional 12% stake in the approximately 980-MW Linden Cogen plant.
Facility
- Activity
- Petroleum refining: crude distilling, catalytic cracking, hydrodesulfurization and alkylation
- Industry
- Industrial
- Site type
- Facility
- Operating status
- Operating
Permits and agreements
- Permit
- Title V operating permit significant modification statement of basis PI 41805
- Agreement
- long-term process steam and electricity sales contracts with large investment grade industrial off-takers in the co-located Bayway refinery
Related records
Timeline
- Jun 6, 2023
- Linden Cogen hydrogen blending commissioning completed
Linden Cogeneration and Phillips 66 Bayway Refinery Complete Hydrogen Blending Commissioning - JERA Americas
- Oct 19, 2026
- EGCO agreement to acquire additional 12% of Linden Cogen
EGCO Group Strengthens US Presence, Increasing Stake to 50% in 980 MW Linden Cogen Power Plant Supplying New York and New Jersey | Electricity Generating