QTS Hillsboro 1
Operating
QTS Hillsboro 1 is a 25-acre data center campus in Hillsboro, Oregon, with its DC1 building at 4951 NE Huffman St. QTS lists 20 MW+ of critical power capacity, redundant power feeds from diverse transformers, an expandable adjacent substation and generators with 48 hours of on-site fuel. Cooling uses indirect air-side economizers. QTS says Avangrid's Tower Solar project will deliver energy to Portland General Electric's grid to support its operations in the region.
Loading map…
Overview
- Campus power
- 20 MW
- Capacity basis unspecified · Reported
- Status
- Operating
- Operating campus
- Site
- 25 acres
- Campus
- Compute profile
- Hyperscale
- Cooling design
- Reported
- Indirect air side economizer cooling
- Project scope
- Campus at 4951 NE Huffman St, Hillsboro, OR.
Power and grid
- Utility
- Portland General Electric
- Substation
Expandable, adjacent power substation
- Point of interconnection
- Not identified
- Interconnection request
- Not identified
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 20 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Operator-reported critical power capacity (20 MW+); basis unspecified. | ||||
- Redundancy
Facility and development
- Site area (acres)
- 25
- Facility class
- Hyperscale
- Cooling systems
- Indirect air side economizer cooling
- Power purchase agreements
- Avangrid Tower Solar project (166 MWdc / 120 MWac) delivering energy to Portland General Electric's grid to support QTS operations in the region