Quail Run Energy Center is a two-block natural-gas combined-cycle plant in Ector County, Texas. EIA's May 2026 inventory reports six operating generators totaling 550.4 MW nameplate, 472.2 MW net summer, and 532.2 MW net winter capability. Four combustion turbines and two steam turbines entered service between May 2002 and May 2008. Calpine acquired the facility from Lotus Infrastructure Partners in September 2024 and describes it as a 550 MW plant.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA inventory for Sep 2026
EIA May 2026
Acquired September 2024
EIA plant 56349 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| CT1A | Natural Gas Fired Combined Cycle | Operating | 90.6 | Unknown |
| CT1B | Natural Gas Fired Combined Cycle | Operating | 90.6 | Unknown |
| CT2A | Natural Gas Fired Combined Cycle | Operating | 86.5 | Unknown |
| CT2B | Natural Gas Fired Combined Cycle | Operating | 86.5 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CT1A | 90.6 MW 70 MW summer | Natural Gas Fired Combined Cycle CT | May 2007 | Operating |
| CT1B | 90.6 MW 70 MW summer | Natural Gas Fired Combined Cycle CT | May 2007 | Operating |
| CT2A | 86.5 MW 68 MW summer | Natural Gas Fired Combined Cycle CT | May 2002 | Operating |
| CT2B | 86.5 MW 68 MW summer | Natural Gas Fired Combined Cycle CT | May 2002 | Operating |
| ST1 | 98.1 MW | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports May 2002 for CT2A and CT2B.
EIA May 2026
| Unknown |
| ST1 | Natural Gas Fired Combined Cycle | Operating | 98.1 | Unknown |
|---|
| ST2 | Natural Gas Fired Combined Cycle | Operating | 98.1 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
8 ERCOT market resources · Combined-cycle gas
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at QALSW_ALL over 365 days (2025-10-26 to 2026-10-25). This plant is also crosswalked to QALSW_CC1, QALSW_CC2; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports May 2007 for CT1A and CT1B.
EIA reports May 2008 for ST2.
Calpine publicly announced that it had acquired the 550 MW facility from Lotus.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Quail Run Energy Center reports 550.4 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Quail Run Energy Center is a Natural Gas Fired Combined Cycle facility in Ector County, TX, participating in the ERCOT market.
Quail Run Energy Center is in Ector County, TX, inside the ERCOT balancing area.
Quail Run Energy Center is operated by Quail Run Energy Partners, LP according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Quail Run Energy Center reported 3,069.8 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
By capacity, Quail Run Energy Center ranks #292 of 540 operating plants of the same technology nationally. It ranks #44 of 68 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.