Riot Platforms Corsicana Campus
Expanding
Riot Platforms' Corsicana campus at 6980 FM 709 S in Navarro County, Texas, connects to ERCOT at 345 kV with 1,000 MW of available capacity. Construction began in 2023 and bitcoin mining started in 2024. Riot is developing AI and HPC data center buildings under its Standard Design; a two-story, 335,428 sq ft data center building (Project Ditto, $400 million) was registered with TDLR with construction from April 2026 to May 2028. Riot curtails mining under ERCOT demand response programs.
Loading map…
Overview
- Campus power
- 1,000 MW
- Capacity basis unspecified · Reported
- Status
- Expanding
- Construction started Apr 27, 2026
- IT floor area
- Not disclosed
- Campus
- Build window
- Apr 27, 2026–May 19, 2028
- Two-story data center building registered with TDLR; estimated cost $400 million.
- Building program
- 1 building · Two-story
- Project Ditto
- Project scope
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 1,000 MW | Capacity basis unspecified | Reported | Campus | — |
| Available capacity at Corsicana per Riot's Q3 2025 update; Riot describes it as 1 GW of fully approved capacity; basis unspecified. | ||||
| 168 MW | Capacity basis unspecified | Reported | Standard Design expansion | — |
| Core & shell building for AI and HPC workloads in the expansion under development; basis unspecified. | ||||
- Interconnection voltage (kV)
- 345
- Grid flexibility
Facility and development
- Construction
- Construction began in 2023 and mining operations began in 2024; core and shell development for AI/HPC data center buildings is under way.
- Facility class
- Crypto Mining · AI HPC
- Permits and dockets
- TDLR project TABS2026020144 (Project Ditto), registered 5/13/2026
- Grid record
- 345 kV