Salt Fork Wind Project, LLC is an EIA-listed onshore wind turbine facility with 174.0 MW in Donley County, Texas, registered as EIA Plant ID 60657. Southern Power is documented as the owner; EDF Renewables developed the project. The facility uses V100 turbines. Commercial operation began in December 2016.
Onshore Wind Turbine
Salt Fork Wind Project, LLC is operating.
ERCOT
EIA plant 60657 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | Operating | 174 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 174 MW 174 MW summer | Onshore Wind Turbine WT | Dec 2016 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Blattner Energy served as EPC contractor for construction and turbines were supplied by Vestas‑American Wind Technology Inc.
ERCOT · Donley County
These authoritative sources together establish the public owner name.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Wind
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at SLTFRK_UN1_2 over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| H Allen Franklin Combined Cycle | 1,995.7 MW | AL | |
| E B Harris Electric Generating Plant | 1,304 MW | AL | |
| Wansley Combined Cycle | 1,239 MW | GA | |
| Rowan | 1,192 MW | NC | |
| Dahlberg | 919 MW | GA | |
| Cleveland Cnty Generating Facility | 736 MW | NC | |
| Edward L. Addison Generating Plant | 701.2 MW | GA | |
| Millers Branch Solar | 380 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioSouthern Power announced acquisition of the approximately 174 MW Salt Fork Wind Facility in November 2016.
Southern Power and EDF stated the facility achieved commercial operation in November 2016.
Southern Power closed on Purchase and Sale Agreements to acquire 100% ownership interest in the 174 MW Salt Fork Wind Project.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Salt Fork Wind Project reports 174 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Salt Fork Wind Project is a Onshore Wind Turbine facility in Donley County, TX, participating in the ERCOT market.
Salt Fork Wind Project is in Donley County, TX, inside the ERCOT balancing area.
Salt Fork Wind Project is operated by Southern Power Co according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Salt Fork Wind Project reported 692 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Salt Fork Wind Project ranks #385 of 1,374 operating plants of the same technology nationally. It ranks #124 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.