STACK POR03 Hillsboro Campus
Operating · STACK Infrastructure · 4735 NE Starr Blvd, Hillsboro, OR
STACK's POR03 is a 55-acre data center campus at 4735 NE Starr Blvd in Hillsboro, Oregon, with six buildings listed. The operator cites approximately 200 MW of total critical capacity, of which 72 MW is operational. Power is supplied by Portland General Electric from a nearby 34.5 kV substation. The first building broke ground in October 2020. The campus sits on the Wave Business Hillsboro Data Center Ring.
Overview
- Campus power
- 200 MW
- Capacity basis unspecified · Reported
- Status
- Operating
- Operating campus
- Site
- 55 acres
- 6 reported buildings · Campus
- Campus buildout
- 180,000 sq ft
- POR03B · Reported
- Compute profile
- Data center
- AI · ML
- Project scope
- Groundbreaking announced October 2020 for a 28-acre first phase with a 180,000 sq ft building; four-building plan at the time.
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 200 MW | Capacity basis unspecified | Reported | Campus | — |
| Operator-reported total critical capacity, basis unspecified. | ||||
| 72 MW | Capacity basis unspecified | Reported | Campus | — |
| Operator-reported operational critical capacity, basis unspecified. | ||||
- Utility
- Portland General Electric
- Substation
- New 34.5 kV substation less than a quarter mile from the site
- Interconnection voltage (kV)
Facility and development
- Site area (acres)
- 55
- Buildings
- 6
- Construction
- Groundbreaking announced October 2020 for a 28-acre first phase with a 180,000 sq ft building; four-building plan at the time.
- Workloads
- AI · ML · cloud
- Fiber and connectivity