Switch Tahoe Reno Citadel Campus
Operating
Operating
The Switch Tahoe Reno Citadel Campus is an operating data center campus in the Tahoe Reno Industrial Center, Storey County, Nevada. Its first building opened in November 2016 and construction continues across the campus. Switch describes a full-completion projection of up to 2 GW, with individual buildings stated at up to 130 MW and up to 55 MW. A pending Switch application covers five 345 kV transmission lines and a substation in Storey County.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| Up to 2,000 MW | Campus Gross Power | Target | Exact Asset | — |
| Full-campus completion projection in the operator's Tahoe Reno 2 sheet | ||||
| 600+ MW | Campus Gross Power | Proposed | Exact Asset | — |
| Campus full build-out capacity stated in 2020 | ||||
| Up to 130 MW | Utility Service | Reported | Exact Asset | — |
| Design capacity of Tahoe Reno 1, the first building | ||||
| Up to 520 MW | Available Power | Proposed | Exact Asset | — |
| Seven additional Citadel data centers planned as of December 31, 2021 | ||||
| Up to 55 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Tahoe Reno 2 building capacity; basis not stated | ||||
| 5 MW | Contracted Power | Contracted | Exact Asset | — |
| Expansion order from an existing semiconductor customer | ||||