Temple Power Station is a two-block natural-gas combined-cycle complex in Bell County, Texas, registered as EIA Plant ID 58001. EIA reports six generators with 1,606.4 MW of nameplate capacity and 1,580 MW of net summer and net winter capability. ERCOT lists three resources for Temple I and three for Temple II, with resource in-service dates of August 1, 2014 and August 1, 2015. Each block uses a 2-on-1 Siemens combined-cycle configuration. BKV-BPP Power LLC owns the two plants; BKV holds 75% of the joint venture and Banpu Power US holds 25%.
Mapped infrastructure geometry associated with this asset.
EIA Form 860
75% BKV · 25% Banpu Power US
Plant 58001
Operating permits O3544 and O3851
EIA plant 58001 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| CTG-1 | Natural Gas Fired Combined Cycle | Operating | 232 | Unknown |
| CTG-2 | Natural Gas Fired Combined Cycle | Operating | 232 | Unknown |
| CTG-3 | Natural Gas Fired Combined Cycle | Operating | 232 | Unknown |
| CTG-4 | Natural Gas Fired Combined Cycle | Operating | 232 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CTG-1 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle CT | Jul 2014 | Operating |
| CTG-2 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle CT | Jul 2014 | Operating |
| CTG-3 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle CT | May 2015 | Operating |
| CTG-4 | 232 MW 232 MW summer | Natural Gas Fired Combined Cycle CT | May 2015 | Operating |
| STG-1 | 339.2 MW | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Bechtel announced the 758 MW Temple II EPC award with Siemens as consortium partner.
22.65 acres · CXA Temple 2 LLC
| Unknown |
| STG-1 | Natural Gas Fired Combined Cycle | Operating | 339.2 | Unknown |
|---|
| STG-2 | Natural Gas Fired Combined Cycle | Operating | 339.2 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
4 ERCOT market resources · Combined-cycle gas
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at PANDA_T1_CC1 over 365 days (2025-10-27 to 2026-10-26). This plant is also crosswalked to PANDA_T1_CT1, PANDA_T1_CT2, PANDA_T1_ST1, PANDA_T2_CC1, PANDA_T2_CT1, PANDA_T2_CT2, PANDA_T2_ST1; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Goldman Sachs and Credit Suisse arranged senior debt; Ares Capital served as documentation agent.
EIA-860 lists generator CTG-1, generator CTG-2, generator STG-1 with this operating date.
EIA-860 lists generator CTG-3, generator CTG-4, generator STG-2 with this operating date.
BKV and Banpu Power US announced the $430 million acquisition.
The 50/50 BKV-Banpu joint venture acquired 100% of Temple I for $430 million.
TCEQ issued the renewed Federal Operating Permit O3544 for Temple I.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Temple Power Station reports 1,606.4 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Temple Power Station is a Natural Gas Fired Combined Cycle facility in Bell County, TX, participating in the ERCOT market.
Temple Power Station is in Bell County, TX, inside the ERCOT balancing area.
Temple Power Station is operated by Temple Generation Holdings LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Temple Power Station reports a commercial operation date of 2014-2015. Current status: operating. Source: EIA Sep 2026.
Temple Power Station reported 8,373.6 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Temple Power Station settles at PANDA_T1.
By capacity, Temple Power Station ranks #17 of 540 operating plants of the same technology nationally. It ranks #3 of 68 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.