Proposed
Tuckahoe Technology Park is a proposed data center campus of about 870 acres in Goochland County, Virginia, whose master developer is Tract through VALCO2 Goochland County, LLC. The application designs for up to 900 MW of utility load across multiple buildings and phases, with Dominion Energy studying three substations. A conditional use permit application filed in August 2026 is under review, and no operator has been selected. No onsite power generation is proposed.
Loading map…
Overview
- Campus power
- Up to 900 MW
- Utility Service · Proposed
- Status
- Proposed
- Proposed campus
- IT floor area
- Not disclosed
- Campus
- Project scope
- Campus at Goochland, VA.
- Power and grid
- Ultimate utility load across multiple buildings and phases
- Cooling and environment
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| Up to 900 MW | Utility Service | Proposed | Exact Asset | — |
| Ultimate utility load across multiple buildings and phases | ||||
| Up to 900 MW | Campus Gross Power | Proposed | Exact Asset | — |
| June 2026 pre-application statement of gross load | ||||
| 900 MW | Capacity basis unspecified | Proposed · target 2034 | Exact Asset | — |
| Traffic memo describes a 900-megawatt campus with an assumed opening year of 2034 | ||||
| 300 MW | Capacity basis unspecified | Target | Exact Asset | — |
| Anticipated load ramp of 300 MW in each of operational years 1, 2 and 3 | ||||
- ISO / RTO
- PJM
- Backup generation
Facility and development
- Water source
- Tuckahoe Creek Service District domestic water and sewer; no wells or groundwater
- Air permits
- Virginia DEQ non-PSD Minor Source Construction Permit and Title V operating permit would be required
- Permits and dockets
- Goochland County conditional use permit application CU-2026-00014, under review
- Grid record
- PJM