U.S. Steel Great Lakes Works
Large load · 1 QUALITY DRIVE, Ecorse, MI
Iron making through the hot rolling line was permanently closed in 2021-2022 while the cold rolling plating line remains in operation. U. S. Steel is investing $28.3 million in pickle line upgrades at Great Lakes Works.
Loading map…
Overview
Iron making through the hot rolling line was permanently closed in 2021-2022 while the cold rolling plating line remains in operation. U. S. Steel is investing $28.3 million in pickle line upgrades at Great Lakes Works.
Profile
- Ownership
- Nippon Steel Corporation and U. S. Steel finalized their partnership.
- Permits and site
- Air Permit to Install 110-23 applies to equipment at 1 Quality Drive in Ecorse and 1300 Zug Island. The Main Plant is located on a 682 acre site in Ecorse.
Facility
- Activity
- Cold-rolled and advanced high-strength flat steel finishing
- Industry
- Manufacturing
- Site type
- Facility
- Operating status
- Operating
Reported Dec 18, 2023