WhiteFiber NC-1
Under Construction
WhiteFiber's NC-1 is an AI data center campus being built in the former Unifi textile plant at 805 Island Dr, Madison, Rockingham County, North Carolina, on 96 acres bought for $45 million in 2025. WhiteFiber has a 99 MW capacity agreement with Duke Energy, which had completed work to deliver the first 54 gross MW by May 2026. Nscale signed a 10-year colocation agreement for the first 40 MW of critical IT load, worth about $865 million. NC-1 is not a bitcoin mining site.
Loading map…
Overview
- Campus power
- 40 MW
- Critical IT Load · Reported
- Status
- Under Construction
- Under Construction
- Site
- 96 acres
- Campus
- Compute profile
- AI HPC · Colocation
- Cooling design
- Reported
- Direct-to-chip liquid cooling
- Project scope
- Retrofit of the former Unifi textile plant into an AI data center campus; a supply-chain issue with medium-voltage switchgear components affected the first delivery to Nscale.
Power and grid
- Utility
- Duke Energy
- Nearest substations
- Unnamed substation100 kV
- Unnamed substation100 kV
- Point of interconnection
- Not identified
- Interconnection request
Facility and development
- Site area (acres)
- 96
- Construction
- Retrofit of the former Unifi textile plant into an AI data center campus; a supply-chain issue with medium-voltage switchgear components affected the first delivery to Nscale.
- Facility class
- AI HPC · Colocation
- Cooling systems
- Direct-to-chip liquid cooling