3 EIA-registered power plants in Shackelford County, TX totalling 565.6 MW of nameplate capacity, ranked and mapped inside ERCOT.
3 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | ||||
|---|---|---|---|---|---|---|
| 1 | Mesquite Wind Power LLCMesquite Wind LLCDetailed profile | 200 MW | Onshore Wind Turbine | Mesquite Wind LLC | Shackelford County | |
| 2 | Post Oak Wind LLCMesquite Wind LLCDetailed profile | 200 MW | Onshore Wind Turbine | Mesquite Wind LLC | Shackelford County | |
| 3 | Hackberry Wind FarmHackberry Wind LLCDetailed profile | 165.6 MW | Onshore Wind Turbine | Hackberry Wind LLC | Shackelford County |
County assignment and capacity come from the EIA generator inventory. Capacity is nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies.