CLAP_CM48-APND
CLAP_CM48-APND is a CAISO market pricing point in the Nevada Power Company zone. It is a pricing location, not a physical asset; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- —
- Waiting for the latest settlement
- Typical price
- —
- No trailing price profile
- Grid location
- Nevada Power Company zone
- Market pricing location
- Mapped facility
- No direct facility mapping
- No physical facility crosswalk published
What happened
Operator events at this pricing point, and outages of the units that settle here with what each did to its price.
Around it
What this pricing point stands for, and the plants, settlement points and territory near it.
- Location type
- LAP settlement point
CAISO settlement point CLAP_CM48-APND.
- Nearest power plant
- CM48
0.2 miles away · 48 MW · solar
Connections
- Utility territory