Brooks Field Substation (CPS Energy), Life Cycle Power mobile diesel/turbine generators V2 DGR1-3
Brooks Field Substation (CPS Energy), Life Cycle Power mobile diesel/turbine generators V2 DGR1-3 is a ERCOT market pricing point in the SouthCentral zone. It is a pricing location, not a physical asset; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- $18.78
- Latest · Sep 25, 11:00 AM CDT
- Typical price
- $36/MWh average
- $29/MWh median · trailing 365 days
- Grid location
- SouthCentral zone
- Market pricing location
- Mapped facility
- No direct facility mapping
- No physical facility crosswalk published
Asset facts
Market identity, price telemetry, and nearby grid context.
- Settlement point
- Settlement point
ERCOT settlement point V2_DGR1_RN.
- Grid location
- SouthCentral zone
Map coordinate 29.3346, -98.4498.
- Nearest power plant
- Blue Wing Solar Energy Generation
3.6 miles away · 13.9 MW · solar
- Price record
- 328,689 price intervals · avg $36/MWh · 365 day window