
Bethlehem Power Plant / Bethlehem Energy Center, unit 8 auxiliary-load bus (STEELCTY 4)
Bethlehem Power Plant / Bethlehem Energy Center, unit 8 auxiliary-load bus (STEELCTY 4) is a PJM market pricing point in the PPL Electric Utilities zone. It is a pricing location, not a physical asset; its locational marginal price represents the marginal value of electricity at this point on the grid.
- Current real-time LMP
- —
- Waiting for the latest settlement
- Typical price
- —
- No trailing price profile
- Grid location
- PPL Electric Utilities zone
- Market pricing location
- Mapped facility
- No direct facility mapping
- No physical facility crosswalk published
Asset facts
Market identity, price telemetry, and nearby grid context.
- Settlement point
- AGGREGATE settlement point
PJM settlement point 34003353.
- Grid location
- PPL Electric Utilities zone
Map coordinate 40.6175, -75.3147.
- Nearest power plant
- Bethlehem Power Plant
0.1 miles away · 1,153 MW · natural gas
- Price record