Natural Gas Fired Combined CycleNYISO · Cattaraugus Countyplant:plant-54076

Indeck Olean Energy Center

Indeck-Olean Limited Partnership - Cattaraugus County - NYISO

Indeck Olean Energy Center is a 1×1 combined-cycle natural-gas cogeneration plant in Olean, New York, operated by Indeck-Olean Limited Partnership. The facility comprises a GE Frame 6 combustion gas turbine rated at approximately 39.6 MW, a heat-recovery steam generator with duct burner, and a Dresser-Rand steam turbine generator rated at approximately 40 MW. The plant was constructed in 1992–93 and commenced production in 1993, with a rated net generating capacity of 79.9 MW. It was originally designed to provide process steam to the adjacent Dresser-Rand Company, though it currently has no steam host and sells electric power to the grid on a contract basis. Natural gas is the primary fuel; distillate fuel oil serves as backup. The facility is connected to the National Grid transmission system at 115 kV and is interconnected at the Homer Hill substation. As of May 2025, the unit was reclassified as a Behind-the-Meter Net Generation Resource and is no longer subject to NYISO dispatch.

Overview

Key fields

Nameplate capacity
90.6 MW

Canonical EIA plant baseline.

Registry anchor
Plant 54076

plant-54076

Structured profile

Technology
Natural Gas Fired Combined Cycle
Operator
Indeck-Olean Limited Partnership

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
GEN146 MW
39.9 MW summer
Natural Gas Fired Combined Cycle
Natural Gas · CT
Jan 1994Operating
GEN244.6 MW
39.3 MW summer
Natural Gas Fired Combined Cycle
Natural Gas · CA
Jan 1994Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
90.6 MW
Natural Gas Fired Combined Cycle
National rank
#464
of 538 operating peers
NY rank
#23
of 39 operating peers

Monthly generation

Download CSV
Latest 12 months
34.5 GWh
Reported net generation
Latest report
Dec 2024
EIA-923 monthly filing
2024 capacity factor
4.3%
Using current reported nameplate capacity
Jan 2022: 20.3 GWh2022-01Feb 2022: 4 GWhMar 2022: 9.6 GWhApr 2022: 25 GWhMay 2022: 21.2 GWhJun 2022: 1.7 GWhJul 2022: 7.3 GWh2022-07Aug 2022: 5 GWhSep 2022: 0 MWhOct 2022: 0 MWhNov 2022: 490 MWhDec 2022: 5.9 GWhJan 2023: 1.1 GWh2023-01Feb 2023: 2.9 GWhMar 2023: 662 MWhApr 2023: 514 MWhMay 2023: 442 MWhJun 2023: 2.8 GWhJul 2023: 15.5 GWh2023-07Aug 2023: 1.4 GWhSep 2023: 6.6 GWhOct 2023: 489 MWhNov 2023: 1.3 GWhDec 2023: 2.5 GWhJan 2024: 3.3 GWh2024-01Feb 2024: 653 MWhMar 2024: 610 MWhApr 2024: 675 MWhMay 2024: 1.6 GWhJun 2024: 7.9 GWhJul 2024: 14.3 GWh2024-07Aug 2024: 4.5 GWhSep 2024: 485 MWhOct 2024: 0 MWhNov 2024: 0 MWhDec 2024: 475 MWh2024-12

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
IN SERVICE
0.1 km
IN SERVICE · 115 kV
0.2 km
IN SERVICE · 115 kV
0.5 km
IN SERVICE · 115 kV
0.5 km
IN SERVICE · 115 kV
1.1 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Construction Start
1992
Construction commenced on the combined-cycle cogeneration facility.
Indeck-Olean Limited Partnership
extapps.dec.ny.gov
Production Start
1993
Indeck Olean Energy Center commenced production with rated net generating capacity of 79.9 MW.
Indeck-Olean Limited Partnership
extapps.dec.ny.gov
Commercial Operation Date
Jun 8, 1994
FERC LGIA specifies June 8, 1994 as the Commercial Operation Date, identifying when the facility was interconnected and began commercial operations under the NYISO interconnection agreement.
Indeck-Olean Limited Partnership · National Grid
nyisoviewer.etariff.biz
Regulatory Approval
1999
FERC accepts interconnection agreement between National Grid and Indeck-Olean for Indeck Olean Energy Center, Docket No. ER99-4238.
National Grid · Indeck-Olean Limited Partnership
nyisoviewer.etariff.biz
Regulatory Approval
Dec 26, 2012
Indeck-Olean LGIA executed between National Grid and Indeck-Olean to provide continued interconnection service using National Grid's transmission system; supersedes the 1999 agreement effective December 26, 2012.
National Grid · Indeck-Olean Limited Partnership
nyisoviewer.etariff.biz

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetOwner / operatorEquipmentOrganization

Parties and identifiers

RelationshipEntityBasis
Owner / operatorIndeck-Olean Limited PartnershipOwner and Operator
Developer / sponsorIndeck EnergyDeveloper / Project Sponsor
Equipment supplierGeneral ElectricOEM
Transmission owner / interconnecting utilityNational GridTransmission Owner
Grid selectionplant:plant-54076Canonical asset page /nyiso/assets/plant/indeck-olean-energy-center.

Reporting portfolio

EIA reporting entity
Indeck-Olean Ltd Partnership
Entity 9261
Operating portfolio
1 plants
1 states
Reported capacity
90.6 MW
Natural Gas Fired Combined Cycle

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. Construction Commencedextapps.dec...

  2. Commercial Production Commencedextapps.dec...

    Indeck Olean Energy Center commenced production with rated net generating capacity of 79.9 MW.

  3. Generators enter operationEIA-860

    EIA-860 lists generator GEN1, generator GEN2 with this operating date.

  4. FERC LGIA Commercial Operation Datenyisoviewer...

    FERC LGIA specifies June 8, 1994 as the Commercial Operation Date, identifying when the facility was interconnected and began commercial operations under the NYISO interconnection agreement.

  5. FERC Interconnection Agreementnyisoviewer...

    FERC accepts interconnection agreement between National Grid and Indeck-Olean for Indeck Olean Energy Center, Docket No. ER99-4238.

  6. LGIA Executednyisoviewer...

    Indeck-Olean LGIA executed between National Grid and Indeck-Olean to provide continued interconnection service using National Grid's transmission system; supersedes the 1999 agreement effective December 26, 2012.

Common questions about Indeck Olean Energy Center

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is Indeck Olean Energy Center?

Indeck Olean Energy Center has a reported capacity of 90.6 MW. Source: EIA Form 860M.

What kind of plant is Indeck Olean Energy Center?

Indeck Olean Energy Center is a Natural Gas Fired Combined Cycle facility in Cattaraugus County, NY, participating in the NYISO market.

Where is Indeck Olean Energy Center located?

Indeck Olean Energy Center is in Cattaraugus County, NY, inside the NYISO balancing area.

Who operates Indeck Olean Energy Center?

Indeck Olean Energy Center is operated by Indeck-Olean Ltd Partnership according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does Indeck Olean Energy Center generate?

Indeck Olean Energy Center reported 34.5 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.

How does Indeck Olean Energy Center compare to other plants?

By capacity, Indeck Olean Energy Center ranks #464 of 538 operating plants of the same technology nationally. It ranks #23 of 39 in NY.

Asset analyst
plant:plant-54076

Ask about Indeck Olean Energy Center

Investigate technology, capacity, output, price behavior, ownership, and related facilities using this profile plus current grid data.