Natural Gas Steam Turbine, Natural Gas Fired Combustion Turbine, Conventional HydroelectricNYISO · Monroe Countyplant:plant-10025

RED-Rochester, LLC

RED-Rochester, LLC - Monroe County - NYISO

RED-Rochester, LLC owns and operates the Eastman Business Park utility system in Rochester, New York, a 1,200-acre district-energy campus. The facility provides electricity, steam, chilled water, wastewater treatment, compressed air, nitrogen, and related utility services to over 100 commercial and industrial customers. The power plant includes six steam-driven turbine-generators totaling 117 MW of capacity, natural-gas-fired boilers at 1,400 and 260 psig, and a 38 MW gas-turbine combined-cycle cogeneration facility. In 2017, RED retired 127 years of continuous coal-fired operations and converted the system to natural-gas fuel.

Overview

Key fields

Nameplate capacity
162.8 MW

Canonical EIA plant baseline.

Registry anchor
Plant 10025

plant-10025

Structured profile

Technology
Natural Gas Steam Turbine, Natural Gas Fired Combustion Turbine, Conventional Hydroelectric
Operator
RED-Rochester, LLC

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
17TG15 MW
15 MW summer
Natural Gas Steam Turbine
Natural Gas · ST
Dec 1968Operating
22TG12.5 MW
12.5 MW summer
Conventional Steam Coal
Bituminous Coal · ST
Aug 1954Operating
41TG25.6 MW
25.6 MW summer
Natural Gas Steam Turbine
Natural Gas · ST
May 1964Operating
42TG25.6 MW
25.6 MW summer
Natural Gas Steam Turbine
Natural Gas · ST
Aug 1967Operating
43TG25.6 MW
25.6 MW summer
Natural Gas Steam Turbine
Natural Gas · ST
Apr 1969Operating
44TG25.6 MW
25.6 MW summer
Natural Gas Steam Turbine
Natural Gas · ST
Aug 1987Operating
49CTG42 MW
36 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Apr 2025Operating
75TG3 MW
2.2 MW summer
Natural Gas Steam Turbine
Natural Gas · ST
Apr 2015Operating
KPR10.4 MW
0.4 MW summer
Conventional Hydroelectric
Water · HY
Jun 1957Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
120.4 MW
Natural Gas Steam Turbine
National rank
#111
of 257 operating peers
NY rank
#11
of 14 operating peers

Monthly generation

Download CSV
Latest 12 months
344.8 GWh
Reported net generation
Latest report
Apr 2026
EIA-923 monthly filing
2025 capacity factor
24.2%
Using current reported nameplate capacity
May 2023: 23 GWh2023-05Jun 2023: 25.1 GWhJul 2023: 25.6 GWhAug 2023: 24.8 GWhSep 2023: 24.7 GWhOct 2023: 20.5 GWhNov 2023: 19.8 GWh2023-11Dec 2023: 25.6 GWhJan 2024: 27.3 GWhFeb 2024: 24.6 GWhMar 2024: 27.3 GWhApr 2024: 23.7 GWhMay 2024: 26.2 GWh2024-05Jun 2024: 30.1 GWhJul 2024: 26.2 GWhAug 2024: 27.8 GWhSep 2024: 23.9 GWhOct 2024: 24.6 GWhNov 2024: 23.2 GWh2024-11Dec 2024: 28.1 GWhJan 2025: 28.3 GWhFeb 2025: 32.6 GWhMar 2025: 27.1 GWhApr 2025: 28.6 GWhMay 2025: 24.6 GWh2025-05Jun 2025: 27.9 GWhJul 2025: 33.6 GWhAug 2025: 30.7 GWhSep 2025: 29 GWhOct 2025: 27.9 GWhNov 2025: 24.7 GWh2025-11Dec 2025: 29.9 GWhJan 2026: 28.9 GWhFeb 2026: 33 GWhMar 2026: 28.6 GWhApr 2026: 26 GWh2026-04

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
NOT AVAILABLE
1.4 km
IN SERVICE
1.5 km
IN SERVICE · 115 kV
2.9 km
IN SERVICE
4.6 km
IN SERVICE
4.8 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Facility Milestone
Jan 1, 1891
Building 1 at Kodak Park was completed with coal boilers and steam-powered refrigeration machines, establishing the earliest documented predecessor utility infrastructure for the Eastman Business Park power plant.
Eastman Kodak Company
red-rochester.com
Fuel Conversion
Jan 1, 1937
Building 101 boilers were converted from coal to natural gas and oil firing, representing an early fuel transition at the Kodak facility.
Eastman Kodak Company
red-rochester.com
Facility Milestone
Jan 1, 1963
Kodak constructed Building 321, which later housed additional coal-fired boilers and four turbine generators as the central power plant.
Eastman Kodak Company
red-rochester.com
Facility Milestone
Jan 1, 1986
Final compliance-type boiler came online at the Kodak utility plant, completing coal-fired generation infrastructure.
Eastman Kodak Company
red-rochester.com
Project Milestone
Oct 1, 2016
Engineering and construction began for RED's coal-to-natural-gas modernization project, a major investment to retire 127 years of continuous coal-fired operations and install new natural-gas-fired boilers and controls.
$75MRED-Rochester, LLC · Ironclad Energy Partners · Stonepeak Infrastructure Partners
red-rochester.com

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetOwner / operatorMarket / regulatorEquipmentContractor

Parties and identifiers

RelationshipEntityBasis
Owner / operatorRED-Rochester, LLCOwner and operator
Former ownerStonepeak Infrastructure PartnersFormer upstream owner through affiliated fund manager
Former owner / parent companyIronclad Energy PartnersFormer upstream owner via Ironclad Energy Holdings and Ironclad Energy Thermal holding companies
Balancing authority / market operator / regulatory counterpartyNew York Independent System Operator (NYISO)Balancing authority and market operator
Fuel supplier / transmission ownerRochester Gas & ElectricNatural-gas pipeline owner and fuel supplier
Regulator / regulatory counterpartyNew York State Public Service CommissionState regulatory authority
EPC contractor / construction contractorFrank Lill and SonEPC contractor for 38 MW cogeneration facility
Equipment supplierGeneral Electric (GE), now GE VernovaOEM of GE Frame 6B gas turbine
Grid selectionplant:plant-10025Canonical asset page /nyiso/assets/plant/red-rochester-llc.

Reporting portfolio

EIA reporting entity
RED-Rochester, LLC
Entity 5624
Operating portfolio
1 plants
1 states
Reported capacity
162.8 MW
Conventional Hydroelectric · Natural Gas Fired Combustion Turbine · Natural Gas Steam Turbine

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. Original Kodak utility plant establishedred-rochest...

    Building 1 at Kodak Park was completed with coal boilers and steam-powered refrigeration machines, establishing the earliest documented predecessor utility infrastructure for the Eastman Business Park power plant.

  2. Building 101 fuel conversion to natural gas and oilred-rochest...

    Building 101 boilers were converted from coal to natural gas and oil firing, representing an early fuel transition at the Kodak facility.

  3. Generator enters operationEIA-860

    EIA-860 lists generator 22TG with this operating date.

  4. Generator enters operationEIA-860

    EIA-860 lists generator KPR1 with this operating date.

  5. Building 321 Constructedred-rochest...

    Kodak constructed Building 321, which later housed additional coal-fired boilers and four turbine generators as the central power plant.

  6. Generator enters operationEIA-860

    EIA-860 lists generator 41TG with this operating date.

  7. Generator enters operationEIA-860

    EIA-860 lists generator 42TG with this operating date.

  8. Generator enters operationEIA-860

    EIA-860 lists generator 17TG with this operating date.

  9. Generator enters operationEIA-860

    EIA-860 lists generator 43TG with this operating date.

  10. Final compliance boiler entered servicered-rochest...

    Final compliance-type boiler came online at the Kodak utility plant, completing coal-fired generation infrastructure.

  11. Generator enters operationEIA-860

    EIA-860 lists generator 44TG with this operating date.

  12. Generator enters operationEIA-860

    EIA-860 lists generator 75TG with this operating date.

  13. Coal-to-natural-gas modernization construction beganred-rochest...

    Engineering and construction began for RED's coal-to-natural-gas modernization project, a major investment to retire 127 years of continuous coal-fired operations and install new natural-gas-fired boilers and controls.

  14. Natural-gas pipeline entered servicered-rochest...

    A new 4.5-mile natural-gas pipeline, constructed and owned by Rochester Gas & Electric through contractor The DDS Companies, was placed into service to supply increased natural-gas demand to RED-Rochester following the coal retirement.

  15. Natural-Gas Transition Completedred-rochest...

    The modernized facility was fully transitioned to natural-gas-fired operations; Eastman Business Park became coal-free for the first time in more than 127 years of continuous utility operations.

Common questions about RED-Rochester, LLC

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is RED-Rochester, LLC?

RED-Rochester, LLC has a reported capacity of 162.8 MW. Source: EIA Form 860M.

What kind of plant is RED-Rochester, LLC?

RED-Rochester, LLC is a Natural Gas Steam Turbine, Natural Gas Fired Combustion Turbine, Conventional Hydroelectric facility in Monroe County, NY, participating in the NYISO market.

Where is RED-Rochester, LLC located?

RED-Rochester, LLC is in Monroe County, NY, inside the NYISO balancing area.

Who operates RED-Rochester, LLC?

RED-Rochester, LLC is operated by RED-Rochester, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does RED-Rochester, LLC generate?

RED-Rochester, LLC reported 344.8 GWh over the twelve months to 2026-04. Figures are net generation as filed to EIA-923.

How does RED-Rochester, LLC compare to other plants?

By capacity, RED-Rochester, LLC ranks #111 of 257 operating plants of the same technology nationally. It ranks #11 of 14 in NY.

Asset analyst
plant:plant-10025

Ask about RED-Rochester, LLC

Investigate technology, capacity, output, price behavior, ownership, and related facilities using this profile plus current grid data.