Aligned IAD-03
Operating
Aligned IAD-03 is at 22715 Relocation Drive in Sterling, Virginia, the first facility of a two-building, 10-acre Aligned campus announced in July 2022. Aligned lists IAD-03 among its Virginia data centers designed to Tier III standards, with N+1 block redundant power, 3 MW back-up generators and a closed-loop chilled water design.
Loading map…
Overview
- Status
- Operating
- Operating facility
- Facility size
- 430,000 sq ft
- Facility
- Compute profile
- Hyperscale
- Project scope
- Facility at 22715 Relocation Dr, Sterling, VA.
- Power and grid
- N+1 block redundant topology
- Compute role
Power and grid
- Utility
- Dominion Energy Virginia
- Market
- Nearest substations
- Unnamed substation230 kV
- Sterling Park230 kV
Facility and development
- Gross floor area (sq ft)
- 430,000
- Facility class
- Hyperscale
- Availability tier
- Designed to Tier III standards
- Cooling medium
- Closed-loop chilled water system design
- Fiber and connectivity