BBT Midland Data Center
Operating
The BBT Midland Data Center is a small colocation facility at 2909 Wright Drive in Midland, Texas, built by converting two existing buildings. BBT, formerly Big Bend Telephone, opened it as its first data center, and a January 2022 announcement described it as open and serving customers. The initial phase delivered 1 MW across 88 racks, and the master plan is 5 MW of critical power across 440 racks. No utility interconnection rating is published.
Loading map…
Overview
Campus power
- 5 MW
- Critical IT Load · Target
- Status
- Operating
- Operating campus
- IT floor area
- Not disclosed
- Campus
- Compute profile
- Colocation
- Project scope
- Refit of two existing buildings into a UPS electrical room and data center, with an interconnection between them
- Power and grid
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 5 MW | Critical IT Load | Target | Exact Asset | — |
| Master-planned total critical power | ||||
| 1 MW | Available Power | Operating | Exact Asset | — |
| Delivered power in the initial phase | ||||
- ISO / RTO
- ERCOT
Facility and development
- Construction
- Refit of two existing buildings into a UPS electrical room and data center, with an interconnection between them
- Facility class
- Colocation
- Racks
- 440
- Permits and dockets
- TDLR accessibility project registration TABS2020011720
- Grid record
Organizations
Big Bend Telephone CompanyOwnerExact Asset