Bitdeer Massillon
Operating
Bitdeer Massillon is a bitcoin mining facility at 1115 Industrial Ave. SW in Massillon, Ohio, owned through subsidiary White Tail Creek LLC. The city described a roughly $170 million project of about 24 server buildings plus a warehouse and office. The site is across from a FirstEnergy substation, and Bitdeer plans its own substation.
Loading map…
Overview
- Status
- Operating
- Operating facility
- Project cost
- $170.0M
- Estimated construction cost.
- Compute profile
- Crypto Mining
- Bitcoin mining
- Project scope
- Approximately 24 server buildings plus a warehouse and office building; a November 2025 fire damaged two buildings under construction, which are being rebuilt.
- Power and grid
- Served by Ohio Edison.
Power and grid
- Utility
- Ohio Edison
- Market
- Substation
Across from a FirstEnergy substation; Bitdeer plans its own on-site substation
- Nearest substations
- Unnamed substation138 kV
Facility and development
- Construction
- Approximately 24 server buildings plus a warehouse and office building; a November 2025 fire damaged two buildings under construction, which are being rebuilt.
- Facility class
- Crypto Mining
- Workloads
- Bitcoin mining
- Project cost (USD)
- 170,000,000
- Permits and dockets