Cedro Hill is a repowered 160 MW wind facility in Webb County, Texas. Clearway reports that all 100 turbines received new blades and nacelles in a $269 million repower completed in early 2025, increasing the physical site's rating from 150 MW to 160 MW. EIA's May 2026 inventory still contains two 150 MW generator records under Plant ID 57260, a 300 MW registry aggregate that does not match Clearway's current physical-site rating. The two scopes are shown separately rather than added together.
Clearway
Clearway
EIA May 2026
Clearway
EIA plant 57260 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 150 | Unknown |
| 2 | Onshore Wind Turbine | Operating | 150 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 150 MW 150 MW summer | Onshore Wind Turbine WT | Dec 2010 | Operating |
| 2 | 150 MW 150 MW summer | Onshore Wind Turbine WT | Dec 2010 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports December 2010 for both registry records.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Wind
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at CEDROHI_CHW1 over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Clearway closed $261 million of construction, term, and letter-of-credit facilities.
Clearway announced completion of the 160 MW repower.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Cedro Hill Wind reports 300 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Cedro Hill Wind is a Onshore Wind Turbine facility in Webb County, TX, participating in the ERCOT market.
Cedro Hill Wind is in Webb County, TX, inside the ERCOT balancing area.
Cedro Hill Wind is operated by Cedro Hill Wind, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Cedro Hill Wind reported 344.5 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
Cedro Hill Wind settles at CEDROHI_CHW1.
By capacity, Cedro Hill Wind ranks #76 of 1,374 operating plants of the same technology nationally. It ranks #26 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.